Business

First look: Indian Railways reveals proposed bullet train design

1 Mins read


First look: Indian Railways reveals proposed bullet train design
This is how India’s first bullet train would look (Courtesy: Indian Railways via ANI)

NEW DELHI: Indian Railways has unveiled the design of the country’s first bullet train, set to run between Mumbai and Ahmedabad, displaying an image of the train at the Ministry of Railways in the national capital.Also Read: India’s first ‘swadeshi’ bullet train to roll out by April 2027“A picture of the country’s first proposed bullet train has been displayed at the Ministry of Railways. The picture has been installed at Gate Number 4,” ANI quoted an Indian Railways statement as saying.In February, railways minister Ashwini Vaishnaw informed the Lok Sabha that the 508-km Mumbai-Ahmedabad High Speed Rail (MAHSR) Project would pass through Maharashtra, Gujarat and the Union Territory of Dadra and Nagar Haveli. The route would have 12 stations — Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati.For the MAHSR project, foundation work has been completed at eight stations in Gujarat (Vapi, Bilimora, Surat, Bharuch, Anand, Vadodara, Ahmedabad, and Sabarmati). Work is under way at Thane, Virar, and Boisar in Maharashtra, while excavation at the Bandra Kurla Complex (BKC) station is nearing completion.Seventeen river bridges have been completed, while work is at an advanced stage on four major bridges — Narmada, Mahi, Tapti and Sabarmati — in Gujarat. Construction is also under way on four river bridges in Maharashtra.At BKC, excavation work is about 91% complete, and construction has begun on the under-sea tunnel section, with 4.8 km between Ghansoli and Shilphata already completed.According to Indian Railways, the project would boost indigenous high-speed rail capabilities under the Make in India initiative, with Integral Coach Factory (ICF), Chennai, and BEML Limited, Bengaluru, jointly developing train sets with a design speed of 280 kmph.



Source link

Related posts
Business

India's current account deficit may widen to 2.3% in FY27 as oil prices rise: HSBC

1 Mins read
India’s current account deficit (CAD) is likely to widen sharply to 2.3 per cent of GDP in FY27 from 0.9 per cent…
Business

Piyush Goyal asks industry to identify import substitutes, pushes local manufacturing to cut dependence

1 Mins read
Commerce and Industry Minister Piyush Goyal on Monday urged industry stakeholders to identify products that can be manufactured domestically to reduce India’s…
Business

Bharti Airtel overtakes HDFC Bank to become India’s second most valuable listed company, what investors need to know

2 Mins read
Bharti Airtel has overtaken HDFC Bank to become India’s second most valuable listed company by market capitalisation, underlining the sharp re-rating in…
Power your team with InHype

Add some text to explain benefits of subscripton on your services.

Leave a Reply

Your email address will not be published. Required fields are marked *